What a kitchen renovation costs in Whitchurch-Stouffville, and what moves the number.
Rough budgets before HST. The real number comes after a site visit and your selections. Layout changes cost more than keeping things where they are.
Rough budgets before HST. HST at 13% goes on top.
Treat these as a starting point for a budget, not a quote. Cabinets and layout move the number more than anything else.
Keeping the sink, range and fridge where they are keeps plumbing, gas and venting simple.
Stock, semi-custom or custom, and the number of drawers and specialty inserts.
Quartz, granite or laminate, and how many seams and cut-outs.
Opening a load-bearing wall adds a beam, an engineer and a permit.
Venting outside needs a duct route planned before the cabinets.
Old wiring, plumbing or framing found at demolition gets fixed first.

Start with a site visit. We look at the kitchen, the walls around it and what you want.
Then a detailed price once the layout and selections are set.
Book a site visitMost run $25,000 to $120,000+ before HST.
About $25,000 to $40,000 with the same layout.
$65,000 to $120,000+, usually with layout changes or a wall removed.
No. The budgets on this page are before HST.
About 4 to 8 weeks of work, plus 3 to 6 weeks for cabinets.
A site visit shows what the space can hold and whether the wall can come out.